PUBLIC PROJECTS & PROGRAMMES · NATIONAL RECORD

Projects and programmes
across Nigeria.

A documented overview of selected federal infrastructure, health, education, energy, transport and youth-development initiatives associated with the administration of President Bola Ahmed Tinubu, from May 2023 onward.

50PROJECT ENTRIES
6BROAD THEMES
2023–2026PERIOD COVERED
HOW TO READ THIS REGISTER

Clear status.
Traceable sources.

This register includes completed projects as well as ongoing construction, launched programmes and policy reforms. Each entry states its reported status and links to a government source. A commissioning ceremony or project announcement does not mean every phase is complete. Photographs are taken from official government galleries and programme coverage wherever an identifiable source photograph was available. Some government releases publish only a general commissioning photograph, not a separate photograph of every named site; those images are identified as source coverage rather than being mislabelled as site-specific. The agriculture entry currently uses an illustrative image because its linked source does not expose an identifiable project photograph.

THE PROJECT REGISTER

Explore the 50 entries.

50 entries shown · filter by sector or search by project, location or status.

Official Federal Ministry of Works photo from the Lagos–Calabar highway milestone gallery01
Transport & roadsConstruction underway; initial 30 km segment commissioned

Lagos–Calabar Coastal Highway, Section I

⌖ Lagos State

A planned coastal corridor intended to improve movement of people and freight along Nigeria’s Atlantic coastline. The first 30 km segment of Section I was commissioned in May 2025; the federal government described the wider first section as a phased contract, not a completed 750 km road. Further sections remain subject to construction and delivery.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Official Federal Ministry of Works road-project gallery photograph02
Transport & roadsConstruction underway in sections

Sokoto–Badagry Superhighway

⌖ Sokoto, Kebbi and planned corridor states

A proposed north-to-southwest transport corridor linking Sokoto with the Badagry/Lagos axis through several states. Government statements describe phased construction, including a 120 km section in Sokoto and a 258 km section in Kebbi. The corridor is intended to connect farms, markets, dams and regional trade routes; it should be described as an ongoing multi-year project.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Official Federal Ministry of Works road-project gallery photograph03
Transport & roadsFlagged off / rehabilitation programme

Zaria–Hunkuyi–Daya Road Rehabilitation

⌖ Kaduna and Kano States

The federal works programme covers approximately 152.67 km across sections I, II and III. The road is intended to improve regional connectivity for communities and commercial traffic between Kaduna and Kano. The project was listed among works flagged off by the President; the page does not present the full route as completed.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Illustrative road construction image04
Transport & roadsFlagged off / reconstruction

Dikwa–Gamboru–Ngala Road Reconstruction

⌖ Borno State

A 49.55 km reconstruction project on an important route in the northeast. Improved road access is expected to support civilian mobility, the movement of goods and access to border communities. The federal announcement records the project as flagged off, rather than fully completed.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Official Federal Ministry of Works road-project gallery photograph05
Transport & roadsConstruction / phased delivery

Kano–Maiduguri Road Dualisation

⌖ Kano, Jigawa, Bauchi, Yobe and Borno States

The announced works cover a 100.95 km dualisation segment intended to strengthen the east-west road connection across five northern states. The corridor is important for passenger travel, agricultural haulage and trade between major towns. Delivery is being undertaken in sections and should be tracked by contract segment.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Official Federal Ministry of Works road-project gallery photograph06
Transport & roadsConstruction flagged off

Maiduguri Ring Road

⌖ Borno State

The 108 km ring-road project is designed to provide an alternative route around Maiduguri, helping through-traffic avoid central streets and improving access to different parts of the metropolitan area. The federal government included it among projects flagged off for construction.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Official Federal Ministry of Works road-project gallery photograph07
Transport & roadsConstruction flagged off

Kano Northern Bypass

⌖ Kano State

The proposed 74 km northern bypass is intended to provide an alternative route for traffic moving around Kano, reduce pressure on urban roads and improve freight movement. It is part of the federal road programme announced for construction; the listing should not be read as confirmation that the entire bypass is already open.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Illustrative highway image08
Transport & roadsRehabilitation / completion works announced

Lokoja–Benin Road Rehabilitation

⌖ Kogi and Edo States

The federal works programme includes rehabilitation of the Lokoja–Benin route using rigid pavement in the relevant sections. The corridor links the North-Central with the South-South and supports passenger transport and the movement of goods. Users should check the latest section-by-section work status before relying on a completion claim.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Illustrative dual carriageway image09
Transport & roadsDualisation programme announced

Oyo–Ogbomoso Road Dualisation

⌖ Oyo State

The announced 104 km dualisation is intended to improve capacity and safety on a busy regional route. Better road conditions can reduce travel delays and improve access for agricultural producers, traders and commuters. It is listed as a programme of works, not as a fully completed road.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Illustrative highway image10
Transport & roadsDualisation programme announced

Kano–Daura–Kongolam Road Dualisation

⌖ Kano, Jigawa and Katsina States

A 264 km road programme intended to strengthen connections between Kano, Jigawa and Katsina and improve movement towards the Nigeria–Niger border. The federal announcement identifies private-sector tax-credit financing for the project. Its full benefits depend on the completion and maintenance of the different sections.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Illustrative road reconstruction image11
Transport & roadsReconstruction programme announced

Bama–Banki Road Reconstruction

⌖ Borno State

The 49.15 km reconstruction project is intended to improve the route connecting Bama with Banki near the Cameroon border. A dependable road can support local trade, humanitarian access and the movement of people and supplies. The government listed it as a tax-credit road project; implementation status should be updated as works progress.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Illustrative completed road image12
Transport & roadsCommissioned section

Kwanar–Hadejia Road, Section II

⌖ Kano and Jigawa States

The 82 km section was listed among road projects commissioned by President Tinubu. It forms part of a wider regional route serving communities and economic activity across Kano and Jigawa. The entry refers specifically to the named section; it does not imply that every adjoining road segment has been upgraded.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Illustrative road image13
Transport & roadsCommissioned

Yakasai–Zalli Road

⌖ Kano State

The Yakasai-to-Zalli road was included among projects commissioned during the administration’s infrastructure programme. Local road improvements can shorten journeys, improve access to services and support commerce within communities. The published federal announcement identifies the road and its commissioning but does not provide a full engineering or traffic-impact assessment.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Official Federal Ministry of Works road-project gallery photograph14
Transport & bridgesCommissioned

Shendam Bridge

⌖ Plateau State

The Shendam Bridge was listed among infrastructure projects commissioned by President Tinubu. Bridges are essential links in local and inter-community transport networks, especially where rivers or seasonal waterways interrupt road access. The official announcement confirms the commissioning; further details on design capacity and maintenance are not stated in that release.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Illustrative bridge image15
Transport & bridgesCommissioned

Jimeta Bridge

⌖ Adamawa State

The Jimeta Bridge was included in the State House list of commissioned infrastructure projects. The bridge is part of the road network serving the Jimeta/Yola area, where reliable crossings support daily commuting and commercial movement. This entry records the reported commissioning and avoids assigning unverified traffic or economic-impact figures.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Illustrative bridge image16
Transport & bridgesCommissioned

Cham–Numan Bridge

⌖ Adamawa State

The Cham–Numan Bridge was identified among projects commissioned under the federal infrastructure programme. A dependable bridge connection can improve access between communities and reduce disruption caused by difficult crossings. The State House announcement confirms the commissioning but does not publish a separate post-completion evaluation.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Illustrative road image17
Transport & roadsCommissioned

Ilobu–Erinle Road

⌖ Kwara and Osun States

This inter-state road was included in the list of projects commissioned by the President. The route supports movement between communities in Kwara and Osun and can improve access to markets and public services. The published release identifies the road as commissioned; it does not provide a quantified assessment of travel-time savings.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Official Federal Ministry of Works road-project gallery photograph18
Transport & trade infrastructureCommissioned

Lekki Deep Sea Port Access Road

⌖ Lagos State

The access road serving Lekki Deep Sea Port and the Dangote industrial area was commissioned in June 2025. It is intended to improve movement of containers, industrial inputs and workers between the port and the wider road network. The State House release notes that the road was delivered through a private-sector tax-credit arrangement.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Official Federal Ministry of Works road-project gallery photograph19
Transport & roadsConstruction underway / section-based contract

Lagos–Calabar Coastal Highway, Section II

⌖ Lagos–Ogun border and coastal corridor

The federal government announced construction of a 55 km segment of Section II from Lagos towards the Ogun border. The wider coastal highway is being procured and built in sections. Its stated purpose is to improve coastal connectivity and access to economic centres; progress should be reported separately for each contracted section.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Illustrative port corridor image20
Transport & trade infrastructureConstruction flagged off

7th Axial Road at Lekki Deep Sea Port

⌖ Lagos State to Ijebu-Ode, Ogun State

The announced 25 km, six-lane road is intended to strengthen access from the Lekki port area towards Ijebu-Ode. The connection is relevant to freight movement, logistics and industrial development around the port corridor. The federal release records the project as flagged off, so it should not be presented as completed.

PHOTO: FEDERAL MINISTRY OF WORKS OFFICIAL GALLERY
Read official source ↗
Official State House commissioning photograph for the nationwide health projects21
HealthcareCommissioned

Bola Tinubu Specialist Complex, FMC Jabi

⌖ Abuja, FCT

The two-storey specialist complex at the Federal Medical Centre, Jabi includes eight consulting rooms, twin theatre suites, ophthalmology and ENT departments, a laboratory, pharmacy, nine VIP wards, four general wards and a private/VIP clinic. It is designed to expand specialist consultation and surgical capacity at the federal facility.

PHOTO: STATE HOUSE OFFICIAL COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for the nationwide health projects22
HealthcareEmergency response fleet launched

National Emergency Medical Service and Ambulance System (NEMSAS)

⌖ Nationwide

The emergency response deployment announced in May 2026 includes 145 tricycle ambulances, six boat ambulances and 79 emergency ambulances for federal tertiary hospitals. Digital coordination devices were also supplied. The fleet is intended to improve referrals and emergency access, particularly for rural, riverine and hard-to-reach communities.

PHOTO: STATE HOUSE OFFICIAL COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for the nationwide health projects23
HealthcareFleet rollout flagged off

CNG Ambulances for Federal Tertiary Hospitals

⌖ All 73 federal tertiary health facilities

A fleet of compressed-natural-gas-powered ambulances was flagged off for federal tertiary health facilities. The stated aims are to lower fuel operating costs, reduce emissions and strengthen referrals between secondary and tertiary hospitals. Actual service coverage and deployment should be monitored at facility level as vehicles enter operation.

PHOTO: STATE HOUSE OFFICIAL COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for the nationwide health projects24
HealthcareCommissioned

Gadon Kaya Primary Health Centre

⌖ Gwale LGA, Kano State

The newly constructed primary health centre in Gadon Kaya was commissioned under the World Bank-supported IMPACT programme. Primary care facilities are intended to bring basic services closer to residents, support immunisation and maternal-child health, and provide an entry point for referrals to higher-level hospitals.

PHOTO: STATE HOUSE OFFICIAL COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for the nationwide health projects25
HealthcareCommissioned

Aboh Primary Health Centre

⌖ Ndokwa East LGA, Delta State

The Aboh Primary Health Centre was commissioned under the IMPACT programme. The project forms part of efforts to improve primary healthcare access in communities where distance and transport can delay routine care. The facility’s value will depend on staffing, essential medicines, equipment and consistent service delivery.

PHOTO: STATE HOUSE OFFICIAL COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for the nationwide health projects26
HealthcareCommissioned

Laboratory Complex, University of Uyo Teaching Hospital

⌖ Uyo, Akwa Ibom State

The new two-storey laboratory complex houses 16 dedicated laboratories alongside seminar rooms, a library, call rooms and staff offices. The facility is intended to strengthen diagnostic capacity, laboratory training and clinical support at the teaching hospital. Its impact will be reflected in reliable testing, turnaround times and quality assurance.

PHOTO: STATE HOUSE OFFICIAL COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for the nationwide health projects27
HealthcareCommissioned

Administrative Complex, University of Nigeria Teaching Hospital

⌖ Ituku-Ozalla, Enugu State

The new administrative complex at the University of Nigeria Teaching Hospital was among the tertiary-health projects commissioned in May 2026. Modern administrative facilities can support coordination of hospital operations and service management. The official release confirms the commissioning but does not provide a detailed staffing or service-performance assessment.

PHOTO: STATE HOUSE OFFICIAL COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for the nationwide health projects28
HealthcareCommissioned

Pharmacy Quality Control Laboratory, ABUTH

⌖ Shika, Zaria, Kaduna State

The Pharmacy Quality Control Laboratory at Ahmadu Bello University Teaching Hospital provides quality-assurance testing for medicines used by the hospital. The release describes Microbiology, Chemistry and Instrumentation units and compliance with British and United States Pharmacopoeia specifications. The facility is intended to strengthen medicine quality oversight and patient safety.

PHOTO: STATE HOUSE OFFICIAL COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for the nationwide health projects29
HealthcareCommissioned

Mental Health and Drug Rehabilitation Centre, UMTH

⌖ Maiduguri, Borno State

The newly constructed 50-bed specialist centre at the University of Maiduguri Teaching Hospital is intended to provide care for people experiencing mental-health and drug-related conditions. It addresses a specialist-care need in a region affected by prolonged conflict and displacement. Sustainable impact will require trained personnel, medicines and follow-up services.

PHOTO: STATE HOUSE OFFICIAL COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for the nationwide health projects30
HealthcareCommissioned

Lagos Immunisation Supply Chain Hub

⌖ Oshodi, Lagos State

Constructed under the World Bank-supported IMPACT programme, the hub is the first completed facility in Nigeria’s three-hub immunisation supply-chain model. It is designed to serve the South-West and South-South zones by improving vaccine storage, handling and distribution. Cold-chain reliability is central to maintaining vaccine quality.

PHOTO: STATE HOUSE OFFICIAL COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for the nationwide health projects31
HealthcareExpanded, renovated and re-equipped

Polio Emergency Operations Centres Upgrade

⌖ Katsina, Kano and Sokoto States

Three state Polio Emergency Operations Centres were expanded, renovated and re-equipped to support immunisation coordination, disease surveillance and outbreak response. The centres pre-date the current administration; the 2026 announcement describes the upgrades and renewed support. This distinction matters when documenting the project’s history.

PHOTO: STATE HOUSE OFFICIAL COMMISSIONING COVERAGE
Read official source ↗
Illustrative primary healthcare image32
HealthcareProgramme ongoing; government reports thousands of facilities revitalised

IMPACT Primary Healthcare Revitalisation Programme

⌖ Nationwide

The World Bank-supported Immunisation Plus and Malaria Progress by Accelerating Coverage and Transforming Services programme supports primary-care facility upgrades and service improvements. The State House reported nearly 3,000 primary health centres revitalised over the preceding two years, alongside emergency obstetric and newborn-care sites. Figures are government-reported programme totals, not a count independently audited on this page.

PHOTO: STATE HOUSE OFFICIAL COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for TETFund education projects33
EducationCommissioned

School of Science Complex, Nasarawa State College of Education

⌖ Akwanga, Nasarawa State

The two-storey School of Science Complex includes reading areas, staff and student e-libraries, a Chief Librarian’s office and reference/inquiry spaces. Delivered through TETFund, it is intended to improve science-teacher preparation for basic and post-basic schools. The building supports teaching and learning capacity rather than representing a new college.

PHOTO: STATE HOUSE OFFICIAL TETFUND COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for TETFund education projects34
Education & defence trainingCommissioned

Nigerian Defence Academy Senate Building Remodelling

⌖ Afaka, Kaduna State

The remodelled Senate Building at the Nigerian Defence Academy includes a 60-seat council chamber, conference suites, executive offices, lift access, CCTV, access control, public-address and evacuation systems, fire suppression and solar backup. It is intended to improve the Academy’s institutional and academic administration facilities.

PHOTO: STATE HOUSE OFFICIAL TETFUND COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for TETFund education projects35
Education & researchCommissioned

Biodiversity and Conservation Centre, NDA

⌖ Afaka, Kaduna State

The Biodiversity and Conservation Centre at the Nigerian Defence Academy is designed to support environmental science research, biodiversity documentation and applied conservation studies. The facility adds research capacity to the Academy’s academic environment and can support practical learning on ecosystems and conservation.

PHOTO: STATE HOUSE OFFICIAL TETFUND COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for TETFund education projects36
EducationCommissioned

Classrooms Complex, Hussaini Adamu Federal Polytechnic

⌖ Kazaure, Jigawa State

The new classrooms complex was delivered under TETFund’s 2024 Special High Impact Intervention. It is intended to address classroom-space constraints and provide a more suitable environment for teaching in engineering, applied sciences, environmental studies, business and management programmes.

PHOTO: STATE HOUSE OFFICIAL TETFUND COMMISSIONING COVERAGE
Read official source ↗
Official State House commissioning photograph for TETFund education projects37
Education & student welfareCompleted and commissioned

Students’ Hostel, Sa’adu Zungur University

⌖ Gadau Campus, Bauchi State

The new student hostel was delivered under TETFund’s 2024 Annual Intervention. The State House report records a contract sum of approximately ₦738.96 million and a 48-week construction period. The accommodation is intended to ease pressure on campus housing and support student welfare as enrolment grows.

PHOTO: STATE HOUSE OFFICIAL TETFUND COMMISSIONING COVERAGE
Read official source ↗
Official 3MTT programme photograph from its website gallery38
Digital skills & youthTraining programme ongoing

3 Million Technical Talent (3MTT) Programme

⌖ Nationwide

Launched in 2023, 3MTT is a federal digital-skills initiative intended to train up to three million Nigerians in technical fields and help build a workforce for technology-related jobs. Its focus includes practical skills, training partners and connections to employment opportunities. The target is a programme ambition, not a claim that three million people have already completed training.

PHOTO: 3MTT OFFICIAL GALLERY
Read official source ↗
Official programme image39
Digital skills & youthLaunched

3MTT Digital Skills Fund

⌖ Nationwide

The Digital Skills Fund was launched alongside the 3MTT National Impact Summit in December 2025. It is intended to support the training ecosystem, expand access to technical learning and strengthen the pipeline between skills development and the digital economy. Funding outcomes and beneficiary totals should be updated from official programme reports.

PHOTO: 3MTT OFFICIAL GALLERY
Read official source ↗
Illustrative image: the linked government source does not publish an identifiable project photograph40
Energy & youth employmentLaunched; training target announced

Power Force Meter Installation Training

⌖ Nationwide

Launched in July 2026, Power Force is designed to train 5,000 young Nigerians to support smart-meter installation under the Presidential Metering Initiative. The programme links technical training with practical work in the electricity sector and is intended to expand installation capacity while creating employment pathways.

PHOTO: STATE HOUSE OFFICIAL CNG COMMISSIONING COVERAGE
Read official source ↗
Illustrative smart electricity meter image41
Energy & electricityMeter rollout ongoing

Presidential Metering Initiative

⌖ Nationwide

The metering initiative is intended to reduce estimated billing by expanding access to electricity meters and improving transparency between distribution companies and customers. In July 2025, the Power Ministry reported more than 300,000 smart meters delivered under the initiative and additional procurement underway. Those figures are dated ministry-reported milestones and should be refreshed as deployment continues.

PHOTO: STATE HOUSE OFFICIAL CNG COMMISSIONING COVERAGE
Read official source ↗
Official government programme image42
Energy & policy reformEnacted

Electricity Act 2023 and Decentralised Electricity Markets

⌖ Federal and state electricity markets

The Electricity Act 2023 provides a framework for a more decentralised electricity market, allowing states to establish and regulate electricity markets within the constitutional and statutory framework. The law is a policy and regulatory reform, not a physical construction project. Its results depend on state-level rules, licensing, investment and grid coordination.

PHOTO: STATE HOUSE OFFICIAL CNG COMMISSIONING COVERAGE
Read official source ↗
Official government programme image43
Energy & policy reformPolicy launched

Integrated National Electricity Policy

⌖ Nationwide

The Federal Ministry of Power reported the launch of an Integrated National Electricity Policy, intended to provide a national framework for sector planning and implementation. The policy seeks to align generation, transmission, distribution, off-grid supply and investment priorities. It is a planning instrument; improvements in power supply require sustained implementation and investment.

PHOTO: STATE HOUSE OFFICIAL CNG COMMISSIONING COVERAGE
Read official source ↗
Official State House CNG commissioning photograph showing deployed buses44
Transport & clean energyNational rollout and expansion underway

Presidential Initiative on CNG and Electric Vehicles

⌖ Nationwide

Initially approved in 2023 as the Presidential CNG Initiative, the programme supports vehicle conversion, refuelling infrastructure, local assembly, technical training and lower-cost alternative transport energy. In March 2026 its mandate was expanded to include electric vehicles and charging infrastructure. This is a multi-year initiative, not a single completed project.

PHOTO: STATE HOUSE OFFICIAL CNG COMMISSIONING COVERAGE
Read official source ↗
Official State House CNG commissioning photograph showing deployed buses45
Transport & clean energyCommissioned / rollout announced

Portland Gas CNG Mother Station and Kubwa Daughter Station

⌖ Ojota, Lagos and Kubwa, Abuja

The CNG infrastructure package announced in May 2026 includes a mother station at Ojota, distribution equipment and a daughter station at Kubwa. The report gives the mother station a daily dispensing capacity of 96,000 standard cubic metres and describes vehicle conversion facilities. These assets are intended to expand access to CNG for transport operators.

PHOTO: STATE HOUSE OFFICIAL CNG COMMISSIONING COVERAGE
Read official source ↗
Official State House CNG commissioning photograph showing deployed buses46
Education & clean transportCommissioned

FEMADEC CNG Daughter Station and Conversion Centre, FUTO

⌖ Federal University of Technology, Owerri, Imo State

The facility at FUTO includes an integrated refuelling unit, storage, dispensing equipment, a vehicle conversion workshop and a training centre. It is part of a 20-university CNG ecosystem and the SPROUT student-transport support programme. The wider initiative also includes CNG buses and tricycles for campus mobility.

PHOTO: STATE HOUSE OFFICIAL CNG COMMISSIONING COVERAGE
Read official source ↗
Official State House CNG commissioning photograph showing deployed buses47
Transport & clean energyImplementation coordination underway

National Affordable CNG Transit Programme

⌖ Federal and state transport corridors

The programme is intended to expand lower-cost public transport through CNG-powered buses, vehicle conversion and cooperation with state governments and transport operators. In September 2026, the Presidency described implementation planning with the Nigeria Governors’ Forum and reported examples of state-supported alternative-energy transport. Fare and passenger figures cited by government should be treated as dated, location-specific claims.

PHOTO: STATE HOUSE OFFICIAL CNG COMMISSIONING COVERAGE
Read official source ↗
Official State House CNG commissioning photograph showing deployed buses48
Transport & clean energyInaugurated

30 Hybrid CNG Buses for Federal Mass Transit

⌖ Abuja, FCT

Thirty hybrid CNG-powered buses were inaugurated in August 2024, with a stated capacity to transport up to 3,000 passengers. The State House said the buses were donated to the federal government by DAPPMAN and NNPC Limited. The entry therefore records a federal transport deployment and the named donors, rather than claiming the buses were manufactured or funded solely by the Presidency.

PHOTO: STATE HOUSE OFFICIAL CNG COMMISSIONING COVERAGE
Read official source ↗
Official State House CNG commissioning photograph showing deployed buses49
Education & transportRollout at participating universities

CNG University Transport Ecosystem (SPROUT)

⌖ Participating universities nationwide

The Special Palliative Relief on University Transportation programme supports cleaner and potentially lower-cost campus transport through CNG infrastructure, buses, tricycles, conversion kits and training facilities. The FUTO conversion centre is one named example in the official rollout. Actual service availability differs by campus and should be verified locally.

PHOTO: STATE HOUSE OFFICIAL CNG COMMISSIONING COVERAGE
Read official source ↗
Illustrative Nigerian agriculture image50
Agriculture & food securityMulti-year interventions; implementation varies by scheme

National Agricultural Growth and Food Security Interventions

⌖ Nationwide

Federal food-security interventions announced by the Presidency have included support for staple-crop cultivation, input access and partnerships with farmers and private agribusiness. The 2023 national broadcast set out proposed cultivation support for rice, maize, wheat and cassava. This entry groups the announced intervention framework; it is not a claim that every hectare or funding target was delivered.

ILLUSTRATIVE IMAGE · NO IDENTIFIABLE PROJECT PHOTO IN LINKED SOURCE
Read official source ↗
EDITORIAL NOTE

Public information.
Public accountability.

NYFB presents this register as an information resource. The entries are drawn primarily from official federal government releases and ministry statements. Government-reported descriptions and figures are attributed to those sources; this page does not independently certify construction quality, expenditure, completion or social impact. Readers are encouraged to consult the linked source and request updated delivery information from the responsible agency.